May 25, 2026
A little delay
Due to me having some trouble with the models [the toilets are broken and has to be remodeled which dont worry - it's in process. Since i can't make everything as fast as possible [since all interiors that i've made have to be revamped a little [theres problems with toilets as said and ovens, fridges]. I'll add a light switch system into the testing phase of the new 2 Story House that will be available [because light switch systems might not be planned but ill try optimizing as much as possible]
